EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
N524JL/N87JL
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (206)
Research
- (2)
Workshop
- (7)
Empennage
- (51)
-
Rolled LE and FINISH
-
Attached trim tab
-
Trim tab assembly...
-
Closing up the left...
-
Left elevator riblet...
-
Right elevator complete
-
*****Right elevator...
-
Right elevator...
-
Bending the elevators
-
Elevator trim...
-
Elevator stiffeners
-
Rolling the rudder...
-
Trailing edge time
-
Rudder skins on
-
Rivet the rudder...
-
New TE wedge in
-
The TE...
-
Rudder counterweight
-
Getting ready for...
-
Rudder...
-
Beveled...
-
Rudder cont
-
Began the rudder...
-
Rudder stiffeners...
-
Beginning rudder
-
Vertical stabilizer...
-
Vert ribs
-
Vert spar
-
VERT CONT
-
Starting the...
-
Finished the...
-
Front spar and left...
-
No going...
-
Dirty hands…
-
New tool
-
Hole enlarged/response
-
Drill...
-
VA146 bearing
-
HS00005&HS00006
-
First look at a...
-
Flange tool
-
HS 714-710 bend&...
-
702 Cont
-
......702 notch...
-
Ok, so here it...
-
Transition to the...
-
Rear spar
-
Inventory time
-
It arrived!!
-
Official owner
-
EMPENNAGE ORDERED
Wings
- (57)
Fuselage
- (64)
Canopy
- (1)
Controls
Firewall Forewar
Engine/Cowling
- (2)
Fuel System
Propeller
- (1)
Instrument Panel
- (6)
Avionics
- (5)
Lighting
Landing Gear
Interior Finish
Paint / Decals
Inspection
Tools
- (7)
Practice
- (2)
Service B’s
- (1)
Builder Name:
Jeremy Leonard
-
Project:
Vans - RV-7A
-
VIEW REPORTS
Total Hours:
1074
Total Flight Time:
Start/Last Date:
Mar 17, 2021 - No Finish Date
Engine:
Lycoming IO360M1B
Propeller:
Sensenich 3 Blade Composite Ground Adjustable/Fixed pitch
Panel:
Garmin G3XTOUCH/GNX375/G5/GTR200/GFC507
Friendly URL:
https://eaabuilderslog.org?s=N524JL/N87JL
Home or Last Project Picture
Jul 14, 2021
Rudder counterweight
- (2 hours)
Category: Empennage
Now its time to drill the holes in the lead counterweight to final size as well as countersink them for the dimples from the bottom rib. The rib also as previously stated has to be dimpled for the bolts that hold the weight in the counterbalance box.
5EFEA0DF-CB0F-4BF1-8DFC-EF536C3584A1.jpeg
165194CF-25F2-4D0A-B856-46021F14473F.jpeg
EF6EBA14-76FB-47AC-9B79-276A65DB77A9.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.